Fire Department

Development Policies

You are here: ...
Home / Fire Prevention & Investigation / Development Policies
405 Fire Extinguishing Systems

405.001 Combined Standpipe – Acceptance 5 Yr Test
405.002 Pre-pipe – Inspections
405.003 Fire Sprinkler Control Valve Access
405.004 Disposition of Water flow Signals
405.005 Dry Pipe Sprinkler Systems Quarterly Maint.
405.006 Dry Standpipes – Five-Year Test
405.007 Fire Protection of Roof Drainage Crickets
405.008 Fire Pump Installation Locations
405.009 Fire Sprinklers in Elevator Shafts
405.010 Flow Switch – Pressure Switch
405.011 Kitchen Range Fire Protection Design
405.012 Reduced Hydraulic Demand Sprinkler System Design
405.013 Location of Inspectors Test Valves
405.014 Non-UL Central Station Requirements
405.015 Power Supply Connection – Electric Sprinkler Alarm Bells
405.016 Sprinkler and Standpipe Systems Insp. Checklist
405.017 Sprinkler and Standpipe Systems Owner Letter
405.018 Sprinkler Piping Under One Inch in Diameter
405.019 Sprinklers Under Roof Projections
405.020 CPVC Hanger Spacing
405.021 Testing of Fire Service Undergrounds
405.022 Clean Agent Ventilation
405.023 Supervisory & Trouble Signals
405.024 Fire Sprinkler Monitoring Systems
405.025 Fire Department Connection Requirements
405.026 Fire Sprinkler Arm-Over Requirements
405.027 Fire Sprinkler Head Replacement
405.028 Five Year Test Procedures
405.029 Sprinkler System Bells
405.030 Specific Application of Window Sprinklers
405.031 Mechanical Tees
405.032 Group S-2 Parking Garage Hose Connections
405.033 Valve Supervision
405.034 Deficient (Loaded) Fire Sprinkler Heads
405.035 NFPA 13D Hydraulic Calculations