Click here to go to a list of all Online Services and Forms


Commissions Green Fresno Pay Utility Bill Fresno Municipal Code
more
Table of Contents for Other Drawings

Alternate Public Improvement Drawings

API-1

Residential Street Geometric Standard - 54' Right of Way

API-2

Residential Street Geometric Standard - 50' Right of Way

API-3

Residential Street Geometric Standard - 40' Right of Way

API-4

Residential Street Geometric Standard - 35' Right of Way

API-5

Residential Street Geometric Standard - 30' Right of Way

API-6

Minimum Traveled Way Formula for Pipeline Installation in Curvilinear Streets

API-7

Minimum Traveled Way Formula for Pipeline Installation in Tangential Streets

API-8

Local Street Driveway Approaches

API-9

Street Furniture Location Diagram

API-10

API Cul-de-sac Detail

API-11

Minnewawa Avenue - Fancher Creek to California Avenue

API-12

Minnewawa Avenue - California Avenue to Butler Avenue

API-13

Minnewawa Avenue - Butler Avenue to Tulare Avenue

API-14

Residential Street Geometric Standard - 60' Right of Way with Street Trees

API-15

Residential Street Geometric Standard - 50' Right of Way with Street Trees

Electrical Standard Drawings

E-1

Streetlight - Major Street

E-2

Streetlight - Local Street

E-3

Streetlight - Local Street, Wood Pole

E-4

Streetlights/Traffic Signals Concrete Pull Boxes

E-5

Streetlight - Connection Diagram

E-6

Streetlight Layout

E-7

Streetlight - Placement Divided Arterial Street

E-8

Streetlight - Placement, Collector Streets

E-9

Streetlight - Placement Local Streets

E-10

Streetlight - Placement, Expressway

E-11

Streetlight - Placement, Cul-De-Sac Streets

E-12

Streetlight - Restrictions, Cul-De-Sac Designs

E-13

Signal Lights PVC Encased Loop Detector

E-14

Signal Lights Loop Detector Placement

E-15

Signal Light Wiring-New Installation 26-100 Cabinets

E-16

Signal Light Wiring-Retrofit of Existing 21-100 Cabinets

E-17

Signal Light Service-Foundation Detail

E-18

Street Lights Wiring

E-19

Vehicle Signal Terminal Location

E-20

Pedestrian Signal and PPB Terminal Locations

E-21

Streetlights - Irrigation Service Installation

E-22

Service Riser Detail From Existing Streetlight

E-23

Signal Lights Coordination Cable Termination

E-24

Signal Lights Equipment Placement Guidelines

E-24A

Signal Lights / Dual Ramps Placement Guidelines

E-25

Streetlight/Safety Light Pole Numbering

E-26

Streetlight Ornamental Pole Numbering

E-27

Signal Lights Foundation Wire-Way Detail

E-28

Streetlight Point of Service Concrete Pull Box

E-29

Downtown Signal & Streetlight Poles Decorative Pole Boundary

E-30

Downtown Street Light Decorative Pole Details

E-31

Downtown Signal Poles Decorative Pole Details - Type 19, 24

E-32

Downtown Signal Poles Decorative Pole Details - Type 26, 29

E-34

Emergency Vehicle Preemption Opticom Connections 721 Detector and LT Count Loop Mod.

E-35

Bus Shelter Lighting Connection Detail

Sewer Standard Drawings

S-1

House Branch and Utilities Locations in Street

S-2

Special Sewer Manhole for Large Diameter Main

S-3

48" Sewer Manhole with Precast Sections and Cast Iron Frame and Cover

S-4

60" Sewer Manhole with Precast Sections and Cast Iron Frame and Cover

S-5

Cast Iron Manhole Frame and Cover

S-6

Sloping Lamphole with Cast Iron Cleanout and Cover

S-7

Installation of Sewer Pipe in Jacked Steel Casing

S-8

House Branch Connections

S-9

Additional Limitations on House Branch Connections

S-10

Sewer Main Trench Bedding and Backfill Detail

S-11

Drop Sewer Main Connections (6" and 8" only)

Water Standard Drawings

W-1

1 1/2" and 2" Service Connection and Meter Box Installation

W-2

1" Service Connection and Meter Box Installation

W-3

Fire Hydrant Installation

W-4

Fire Hydrant Installation Valve Operator Detail

W-5

Typical Fire Hydrant Marker Locations

W-6

Thrust Block for Dead End Water Main

W-7

Valve Lid and Paving Ring with Galvanized Casing

W-8

Installation Procedure for Paving Ring and Lid

W-9

Permanent Blow-off Assembly Type "A"

W-10

Permanent Blow-off Assembly Type "B"

W-11

Reduced Pressure Principle Backflow Assembly Installation

W-12

Double Check Valve Installation

W-13

Automatic Air Release and Vacuum Valve

W-14

Pressure Vacuum Breaker Backflow Preventer Installation

W-15

Typical Enclosure for Backflow Prevention Devices

W-16

Fire Service Detector Check Installation

W-17

Detector Bypass Meter Details

W-18

Detector Check Requirements Related to Fire Service Imp. Greater than 2"

W-19

Installation Requirements for Air Gap Separation

W-20

Approved Alternate Installation Requirements for Air Gap System

W-21

Approved Portable Water Transport Backflow Protection

W-22

Guard Post Details

W-23

Fire Hydrant Installation with Protector Post

W-24

Installation of Water Pipe in Jacked Steel Casing

W-25

Valve Anchor for Line Valve

W-26

Alternate to Full Concrete Encasement

W-27

Typical Intersection Connections

W-28

Service Casing

W-29

Water Main Bedding Details

W-30

Monitoring Well Manhole Construction Detail

W-31

PVC Tee Restraints

W-32

PVC Bend Restraints

W-33

PVC Pipe Restraints

W-34

Ductile Iron Tee Restraints

W-35

Ductile Iron Bend Restraints

W-36

Ductile Iron Pipe Restraints

W-37

Hydrant Run Tee Restraint for PVC or Ductile Iron Pipe

W-38

Concrete Vault and Cover Details

W-39

Concrete Vault Knockout Details

W-40

Compound Meter Setting with By-Pass

W-41

Turbine Meter Setting with By-Pass

W-42

Fire Service Meter Setting with By-Pass

W-43

Tempory RP Principle Backflow Assembly Installation