Important Documents

The following documents represent Fresno's plans to address severe water shortages, and the City's vision for providing a sustainable water supply for future generations.

NOTICE
OF PREPARATION
METROPOLITAN WATER RESOURCES MANAGEMENT PLAN UPDATE 
EIR SCOPING MEETING 
EIR FACT SHEET 
PHASE 1, 2 & 3 REPORTS
Phase 1 Baseline System Characterization Dec 2007
Phase 2 Development and Evaluation of Future water Supply Plan Jan 2011
Phase 3 Implementation Plan Jan 2011
Jan 2014 Addendum
Phase 1 Appendices:
A--Non-Fresno Demand
B--Land Use
C--Revised Muni Code
D--Water Conservation Plan BMPs
E--Water Meter Plan
F--Non-Fresno Supply
G--Schmidt Report
H--Carollo TM 1.4
I--Water Supply Summary
J--FID and USBR Contract
K--Revised Nov 2007
L--Hydraulic Model Development
M--Wastewater Figures
N--1.9 Final Revised Oct 2007
Phase 2 Appendices:
Appendix A WTP Siting
Appendix A-1
Appendix A-2
Appendix A-3
Appendix B Carollo TMS
1.4 2.3 2.4 2.6
Appendix C FMFCD Recharge Rpt - BCF TM 2.6
Appendix D--FINAL---Fresno_Metro_Plan_Model Results
Appendix E Well Impacts
Appendix F TM Survey
FRESNO METRO PLAN UPDATE PUBLIC DRAFT EIR 
Volume 1 - Draft Environmental Impact Report
Volumne 2 - Appendices Draft Environmental Impact Report


2010 URBAN WATER MANAGEMENT
 
Urban Water Management Plan 
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
Appendix I
Appendix J


MFS CONNECTION FEE
2013/2014 MFS CONNECTION FEE ANALYSIS & STUDY 
City of Fresno Water Division


WATER UTILITY FINANCIAL PLAN
WATER UTILITY FINANCIAL PLAN And Rates Study, Final Report
 

CONSUMER CONFIDENCE REPORTS
2012 Consumer Confidence Report

2012 Consumer Confidence Report - Spanish
2012 Consumer Confidence Report - Hmong
2012 Consumer Confidence Report - Vietnamese

Contact Us
1910 E. University Ave.
Fresno, CA 93703-2927
(559) 621-5300
(559) 621-5480
E-Mail Us
Division Home